Practical guides to the cadastre, legalization and surveying procedures — without unnecessary jargon.
A drone is not a toy for pretty pictures — in surveying it measures in a few hours what classic methods would need days for.
Read the guideSince 1 February 2026 survey reports are prepared under a new rulebook — digitally and to uniform rules. For clients the changes are mostly good news.
Read the guideWhy do surveyors not have a simple price list? Because two seemingly identical parcels can mean completely different amounts of work. Here is what the price really consists of — and how to get a fixed quote.
Read the guideYou need a surveyor at least four times during construction. Here is the whole sequence — so nothing gets forgotten.
Read the guideSelling or inheriting an older house and everyone mentions the use permit? For many old houses it is replaced by simpler documents.
Read the guideA parcel without access to a public road is worth much less — and many discover it only when applying for a building permit.
Read the guideThe probate decision is often just the beginning — inherited properties tend to be unregistered, mismatched and divided on paper differently than in reality.
Read the guidePlanning to divide a meadow or field? Outside the construction zone a 1 ha minimum parcel size applies — with two statutory exceptions. Check before ordering a survey.
Read the guideWithout condominium division you do not formally own your flat — you own a share of the building. Here is when that becomes a problem.
Read the guidePrice and location are only the beginning. These six checks save buyers from expensive surprises — and most can be done in a day.
Read the guideInherited a house or building in the old country while living in Germany or Austria? Almost all the paperwork can be handled remotely.
Read the guideFor houses built before 15 February 1968 no building or use permit is required — legality is proven with a certificate of construction time. Here is how it works.
Read the guideThe legalization decision is in hand, but the job is not finished. Here is what follows to make the property fully in order.
Read the guideMost rejected applications fail on formalities, not on merit. These five mistakes are the ones we see most — and all are avoidable.
Read the guideThe key legalization condition is that the building exists on the orthophoto of 21 June 2011. Here is how to check from your armchair.
Read the guideLegalization applications are open again — this time with no deadline and fully digital. An overview of the changes and what they mean for owners of unpermitted buildings.
Read the guide